ReadyInfra develops edge data centers and advises the platforms that build them. Six practice areas span site selection and capital diligence through the developer-to-operator transition—each with dedicated frameworks, delivery pods, and evidence-backed artifacts.
Two development practice areas and four operational ones. Deployed together or as targeted engagements, depending on where you are in the lifecycle.
Mid-scale inference nodes on metro-edge sites—site selection against measured fiber and power, entitlement, modular build, and operations under one accountable team. ReadyInfra develops as principal, not as a fee-only advisor.
Independent technical and operational diligence on sites, assets, and platforms under acquisition—power path, fiber, entitlement risk, capex realism, and the operating cost the model has to carry after close.
Structured readiness gates, turnover evidence packages, and Day 1 operating baselines that translate commissioning completion into SLA-defensible operations—before the keys are handed over.
Shift coverage models, role design, hiring lead-time planning, and structured onboarding that puts the right team in place before go-live—not scrambling for headcount during commissioning.
Training systems, operator qualification pathways, and competency measurement frameworks that compress the time from hire to fully capable operations staff—the operational equivalent of speed-to-market.
OT cybersecurity posture across BMS, EPMS, and controls infrastructure—vendor remote access governance, firmware lifecycle management, supply chain risk controls, and investor-grade risk registers.
These are not edge cases. They are recurring, expensive, and preventable—if operational planning starts early enough.
The ops leader is hired in the final sprint. SOPs, spare strategy, CMMS, training, and turnover documentation are incomplete at commissioning. Readiness gates don't exist in the schedule.
Documentation exists but is fragmented, inconsistent, or not mapped to procedures, maintenance plans, and training. The ops team inherits a file room, not a system.
Hiring lead time, background checks, shift coverage modeling, and training time are absent from the master schedule. The team isn't ready when the facility is.
Early operations leans on 1–2 key people. There are no documented procedures, no qualification pathways, no succession depth. One resignation creates an operational crisis.
BMS, EPMS, and controls infrastructure—vendor remote access, firmware lifecycle, supply chain risk—are not governed like the critical infrastructure they are.
KPI packs, evidence, risk registers, change control, and investor reporting rhythms come late—creating friction in hyperscaler audits, diligence, and refinancing.
Regardless of which practice area you engage, ReadyInfra applies the same four-phase delivery methodology—ensuring that every engagement produces measurable artifacts, not just advisory recommendations.
Rapid readiness assessment tied to the project schedule and SLA exposure. Identify gaps, dependencies, and critical path risks.
Operating model, staffing ramp, governance artifacts, and readiness gate criteria tailored to the developer's platform and tenant profile.
Pod-based execution with role clarity and weekly steering. Specialists embedded where the work happens—not remote reviewers.
KPI packs, risk registers, and governance rhythms that provide investor-grade evidence of operational maturity at every review cycle.
Parcels screened on measured fiber distance to carrier hotels and exchanges, existing utility service, substation headroom, water, zoning, and environmental condition—before an LOI is written.
Zoning, permitting, and interconnection or on-site generation agreements carried in-house, with the community engagement that decides whether a project gets built at all.
A defined set of modular hall designs matched to rack density, fabricated off site and phased in with demand, so footprint, cost, and schedule are known from the day the data room opens.
Rack-ready colocation operated to ReadyInfra’s own readiness standard—gates, turnover evidence, qualified staff, and OT governance in place before the first tenant load.
Independent read on the power path—existing service, capacity actually available, queue position, substation constraints, and what the utility has and has not committed to in writing.
Measured route distance to relevant carrier hotels and exchanges, carrier diversity on the ground, and whether the latency the asset is being sold on is achievable.
Condition of critical systems, remaining useful life, deferred maintenance, and a capex view that separates what the model assumes from what the building will actually require.
Staffing, maintenance contracts, and governance load the asset carries after close—the operating cost that underwriting routinely understates, stated in terms the IC can test.
Gate 0–4 with entrance/exit criteria, evidence requirements, and schedule integration. Each gate has a go/no-go decision point.
Mapped to system boundaries—O&M manuals, test evidence, as-builts, sequences of operation, and maintenance baselines.
Alarm response, maintenance tasks, escalation paths, and emergency procedures—validated before go-live, not after.
Closeout dashboard aligned to system boundaries showing evidence completion status and open items at every review cycle.
End-to-end model from job posting to Day 1 qualified operator—with background check lead time, training windows, and shift coverage milestones built in.
Staffed shift schedules aligned to SLA obligations, facility criticality tier, and tenant requirements. Quantifies coverage gaps before they become failures.
Operations role matrix with clear scope, escalation authority, qualification requirements, and compensation benchmarks for each position.
Structured 30/60/90-day onboarding aligned to qualification milestones, safety orientation, system familiarization, and procedure validation.
System-by-system qualification framework with defined competency criteria, observation checklists, and sign-off requirements for each operations role.
Layered training program—safety, systems familiarization, procedure execution, and scenario-based drills—mapped to the facility's critical systems.
Evidence-based records of qualifications achieved, training completed, and recurring recertification requirements for each team member.
Structured process for converting institutional knowledge held by founding team members into documented procedures and transferable expertise.
Structured inventory of OT risks across BMS, EPMS, and controls—rated by likelihood, consequence, and current control status. Investor-ready format.
Governance framework for third-party remote access to critical control systems—with approval workflows, session logging, and revocation procedures.
Documented policy for firmware version management, patch windows, and supply chain verification for OT components across critical infrastructure.
Investor and tenant-grade governance documentation covering OT controls, change management, incident response, and compliance alignment.
Whether you're 18 months from go-live or already in commissioning, ReadyInfra can identify your highest-priority exposure and map a path to SLA-defensible operations.